Geothermal Installation: Part 2

Image

Currently we have hit a snag in our installation of our geothermal system. The first snag was an application that missed a signature by the geo company on our permit application to the County. The second snag dealt with Miss Utility not marking the lines for the home water and sewer lines. So recently when we got home from a trip we noticed that Miss Utility had come out along with the drilling company to flag our property. My husband noticed that the drilling flags were right on top of our water and sewer lines that enter and exit our home. The county further came out and noticed the same issue. We contacted the geo company and they came out today with line locators to mark our lines in the front yard.

One obstacle is going to be the county telling the Geo company how far away the wells actually need to be from each line in order to drill in the correct location. Not to mention if our main line ever went out we would need to be far enough away from the wells as to not disturb them. So far Loudoun County hasn’t been any help because on three separate occasions they have told the Geo company three different distances the wells need to be from the utility lines.

At this point we are completely frustrated with the process as it’s now January 20th and nothing has been started but a bunch of fingering pointing. If we hadn’t said anything to the County the drillers would have severed both the water and sewer line in our front yard. Here is hoping that the County inspection tomorrow goes well and we can get our permit for the wells. Drilling can’t start soon enough as the temperatures are going to dip down into the 20s for about a week.

Crossing my fingers…..

Update

Our permit was approved and drilling can commence. Now for snag number three. We are third in line for drilling to begin and with the weather being just a tad above freezing it’s most likely going to happen in February. Makes me wonder if they hadn’t missed a signature on our application for permit would we still be waiting until February. Not to mention they have about $18,000 of our dollars with nothing but flags in our yard and our old system working hard to get through these cold days.